Fiscal Year 2016 Danger Pole Replacement Project for Fidalgo-Lopez #5 Structure 7/1 CX(s) Applied: B1.3Date: 02/12/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Miscellaneous Pump Maintenance Parts, 2016-2020 (Multiple) CX(s) Applied: B1.3Date: 02/10/2016 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Repair Septic Tank Drain Field Located at the Jackson Barricade CX(s) Applied: B1.3Date: 02/10/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Site-Wide Routine Maintenance Activities, 2016 Update CX(s) Applied: B1.3Date: 02/09/2016 Location(s): New YorkOffices(s): West Valley Demonstration Project
McNary-John Day Transmission Line Mile 34-38 Access Road Repair Project CX(s) Applied: B1.3Date: 02/09/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Damper Installations on the Cougar-Thurston #1 Transmission Line Corridor CX(s) Applied: B1.3Date: 02/05/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Glen Canyon Substation Emergency Waterline Repairs CX(s) Applied: B1.3Date: 02/04/2016 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Roof Repairs at 735-A, D-127 CX(s) Applied: B1.3Date: 02/04/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Roof Repairs at 735-A CX(s) Applied: B1.3Date: 02/04/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 731-4N CX(s) Applied: B1.3Date: 02/04/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office