Bryan Mound-Seaway Pipeline Inspection and Repair (BM-MM-1050) CX(s) Applied: B1.3Date: 03/29/2016 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Remove Damaged Parts and Clean Switchgear at 681-3G CX(s) Applied: B1.3Date: 03/29/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Herbicide Application at 11 Substations located in Arizona and Nevada, 2016-2017 CX(s) Applied: B1.3Date: 03/29/2016 Location(s): Multiple LocationsOffices(s): Western Area Power Administration-Desert Southwest Region
Subcontractor Will Provide Roof Repairs at 661-6E CX(s) Applied: B1.3Date: 03/25/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 704-1N CX(s) Applied: B1.3Date: 03/25/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Roof Repairs at 703-41A CX(s) Applied: B1.3Date: 03/25/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Substation Maintenance and Renovation Activities for 2016-2017 CX(s) Applied: B1.3Date: 03/25/2016 Location(s): Multiple LocationsOffices(s): Western Area Power Administration-Desert Southwest Region
Protection and Communication Facilities Maintenance and Minor Additions or Modifications to Existing Infrastructure 2016-2017 CX(s) Applied: B1.3, B1.7, B1.19Date: 03/25/2016 Location(s): Multiple LocationsOffices(s): Western Area Power Administration-...
Asphalt Paving Projects in S-Area CX(s) Applied: B1.3Date: 03/23/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
686-G L-Lake Sluice Gate Conduit Cleanouts/Inspections CX(s) Applied: B1.3Date: 03/23/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office