Addy-Cusick No. 1 Mile 20 to 22 Road Improvement & Ford Construction CX(s) Applied: B1.3Date: 04/18/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Fairview-Bandon No. 1 Span 12/2 Impairment Remedy CX(s) Applied: B1.3Date: 04/15/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Marion-Alvey Transmission Line Mile 1-43 Access Road Upgrade Project CX(s) Applied: B1.3Date: 04/14/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Algae Control in the 281-8F Retention Basin, ETP 241-97F Cooling Water Basin, and 241-103H Cooling Water Basin CX(s) Applied: B1.3Date: 04/13/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Repair Broken Asbestos-Containing Siding & Wall Panels in 105-C CX(s) Applied: B1.3Date: 04/13/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Craig Rifle 230 Kilovolt Transmission Line Vegetation Management Moffatt and Rio Blanco Counties CX(s) Applied: B1.3Date: 04/12/2016 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region
Big Eddy-Redmond Transmission Wood Pole Replacement CX(s) Applied: B1.3Date: 04/12/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Subcontractor Will Provide Roof Repairs at 105-L (Disassembly Curb) CX(s) Applied: B1.3Date: 04/06/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Gering Field Office Substations and Microwave Sites Vegetation Management CX(s) Applied: B1.3Date: 04/06/2016 Location(s): Multiple LocationsOffices(s): Western Area Power Administration-Rocky Mountain Region
Install New Freezestats in the 233-H Supply Air Handling Unit CX(s) Applied: B1.3Date: 04/06/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office