Big Eddy-Redmond #1 Wood Pole Replacement (Part 2) CX(s) Applied: B1.3Date: 09/28/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Dredging of Bryan Mound Raw Water Intake Structure Inlet Channel CX(s) Applied: B1.3Date: 09/28/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Subcontractor Will Provide Roof Repairs at 741-2N CX(s) Applied: B1.3Date: 09/24/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
The Subcontractor Will Provide Roof Repairs at 717-5N CX(s) Applied: B1.3Date: 09/24/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 246-H CX(s) Applied: B1.3Date: 09/24/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Lone Butte Substation Erosion Repairs CX(s) Applied: B1.3Date: 09/22/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Subcontractor Will Provide Roof Repairs at 720-H CX(s) Applied: B1.3Date: 09/22/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
B-922 Roof Replacement CX(s) Applied: B1.3, B1.15, B2.1Date: 09/22/2015 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Inspect Big Hill 48 Inch Raw Water Intake Pipeline (BH-MM-1200) CX(s) Applied: B1.3Date: 09/21/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Subcontractor Will Provide Roof Repairs at 192-2K CX(s) Applied: B1.3Date: 09/17/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office