Decontaminated Salt Solution Coalescer Pump Upgrade CX(s) Applied: B1.3Date: 07/13/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
782-A Service
Wood Pole Replacements on Salem-Grand Ronde #1 & Grand Ronde-Boyer #1 Transmission Line Corridor CX(s) Applied: B1.3Date: 07/08/2015 Location(s): OregonOffices(s): Bonneville Power Administration
B-922 West Office Renovation: 1st, 2nd & 3rd Floors CX(s) Applied: B1.3, B1.15, B2.1Date: 07/07/2015 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Subcontractor Will Provide Roof Repairs at 705-C CX(s) Applied: B1.3Date: 07/07/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 704-C CX(s) Applied: B1.3Date: 07/07/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Clean Bryan Mound Crude Oil Tank, BMT-4 CX(s) Applied: B1.3Date: 07/06/2015 Location(s): None ProvidedOffices(s): Strategic Petroleum Reserve Field Office
BH Anhydrite Pond Chlorides Wash - Pilot Test and Full Pond Chlorides Wash CX(s) Applied: B1.3Date: 07/06/2015 Location(s): None ProvidedOffices(s): Strategic Petroleum Reserve Field Office
BH Anhydrite Pond Sample Collection and Analysis - Pilot Test and Full Pond Chlorides Wash CX(s) Applied: B1.3Date: 07/06/2015 Location(s): None ProvidedOffices(s): Strategic Petroleum Reserve Field Office
Remove Oil from Bryan Mound Crude Oil Tank BMT-4 Sump CX(s) Applied: B1.3Date: 07/06/2015 Location(s): None ProvidedOffices(s): Strategic Petroleum Reserve Field Office