The proposed actions comprise maintenance support services frequently and routinely requested for operational support of DOE facilities and propert…
Radiological buffer and contamination areas will be re-painted in H area due to normal wear and tear and weathering. Several buildings will also be…
Storm drain piping in 105-L will be replaced.…
The purpose of the demolition of Site 50, 52, and 55 houses at Fermi National Accelerator Laboratory (Fermilab) in Batavia, IL, is to reduce excess…
The project will be the complete physical demolition of Building 526. Building 526 is 27,194 sq. ft. and was built in 1943. The building was used f…
Naval Nuclear Laboratory will be contracting to perform Decontamination and Decommissioning (D and D) Projects (Task Order No. 2) to remediate, dismantle, and dispose of select above grade structures and select components associated with Building 19 (S3G Plant Support/Interactive Display Equipment (IDE) Building), Building 20 (Equipment Service Building), Building 21 (Fuel Service Building), Building 80A and 80B (M-140 Complex), and Pad 90 (MARF Reactor Access Enclosure).
The U.S. Department of Energy (DOE) is proposing to authorize the administration of a four-phase prize competition, known as the "National Building…
The scope of the West Campus (formerly Valley National Gas) Demolition and Site Restoration Project includes modifications to the site to support mobilization and future decommissioning operations by Department of Energy Office of Environmental Management (DOE-EM) at the Naval Nuclear Propulsion Program (NNPP) Bettis Laboratory.
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform containment, removal, and disposal of lead-based paint in accordance …
The Kesselring Site Perimeter Roads Maintenance Project will rehabilitate approximately 11 miles of the Kesselring Site Perimeter Roadway System to include 6 miles of the perimeter loop road and 5 miles of spur roads.