The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
The KS Firehouse Replacement project will provide proper facilities and space required to support emergency services organizations and better enable them to fulfill their role in managing Kesselring Sites (KS) 3905 acres.
The U.S. Department of Energy’s (DOE) Weatherization Assistance Program (WAP) is authorized per Title IV of the Energy Independence and Security A…
The project will be the complete physical demolition of Building 129.…
The U.S. Department of Energy proposes to operate and maintain the South Table Mountain Energy Park (STEP) as part of the National Renewable Energy…
Ownership of the Radiation Research Building, currently owned by the Department of Energy (DOE) and located on the UND campus, would be transferred…
The primary purpose of the Building Q3 Dismantlement Project is to remove the existing building to accommodate the construction of a new multi-story office building, along the eastside of the Knolls Laboratory, Building Q3.
The U.S. Department of Energy (DOE) administers the Weatherization Assistance Program (WAP) authorized by Title IV, Energy Conservation and Product…
The proposed scope of the project is to improve existing stormwater drainage infrastructure by constructing new stormwater best management practices (BMPs) to improve water quality and control rate and volume of stormwater discharge at Outfall 001 (OF-001
The purpose of the Knolls Laboratory Steam and Condensate Upgrade Project (Project) is to replace significant portions of the existing steam and condensate distribution system that are beyond their useful service life, vulnerable to service disruptions an