Categorical Exclusion Determinations: B1.33

Western Area Power Administration (WAPA) will expand the Winner Substation yard to the north, within the existing property boundary to upgrade the …
Western Area Power Administration (WAPA) will expand the Winner Substation yard to the north, within the existing property boundary to upgrade the …
The scope of the Bettis Atomic Power Laboratory North Campus Utility Corridor Project is to support the existing Fire Water and City Water utility services to the North Campus area, which are currently supplied by a looped system that provides redundant service from two directions in the event of a localized system failure.