The project plans to add a turn lane as Taylor Blvd approaches the Service Road on the south side of the MFC parking lot. …
To construct a communication tower, foundation for a prefabricated concrete building, parking garage, chain link fence, and perform ditch redevel…
The scope of the C-Area Ground Level Parking Project involves the alteration of two temporarygravel parking lots into a permanent asphalt parking lot…
The scope of the A7 Office Building project includes the design and construction of a multi-storyoffice building located within the parking lot in a …
The scope of the Knolls Laboratory Outfall 005 Maintenance and Repair Project willinclude the removal of sediment that has accumulated directly upstr…
During a preconstruction meeting, it was identified that approximately 5,000 yards of excess topsoil will be removed from the MFC parking lot to ma…
This EC revision includes a handful of scope additions. …
"The scope of the East End Land Acquisition (Minchoff Property) includes the initial procurement of
the property and subsequent demolition, remova...
the property and subsequent demolition, remova...
"The scope of the CX Dump Tank Complex Demolition and Site Restoration project includes demolition of all of the components making up the CX Dump...
This revision captures changes to project scope. The proposed action no longer includes a new trench drain between buildings Test Area North (TAN)-…