This EC revision includes a handful of scope additions. …
"The scope of the East End Land Acquisition (Minchoff Property) includes the initial procurement of
the property and subsequent demolition, remova...
the property and subsequent demolition, remova...
"The scope of the CX Dump Tank Complex Demolition and Site Restoration project includes demolition of all of the components making up the CX Dump...
This revision captures changes to project scope. The proposed action no longer includes a new trench drain between buildings Test Area North (TAN)-…
The scope of the Waste Processing (WP) Building Demolition and Site Restoration project includes removal and disposal of the building, slab...
The purpose of this revision is to expand the scope of the parking area reconfiguration. The Materials and Fuels Complex (MFC) lacks adequate emplo…
The project includes replacement of the Firing Range ventilation system, replacement of the roof membrane to eliminate entry of precipitation into …
The purpose of this revision is to capture additional project scope. The repaving project required a temporary turn-around location to accommodate …
The scope of the Battery Building Modification project includes an expansion of the building, replacement of electrical equipment and roofing membr…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducts routine maintenance activities at existing facilities in five stat…