This revision captures updates to the project scope. …
Knolls Laboratory-Chemistry Laboratory and Radiological Health Facility, Building T3, Construction Project
The project plans to add a turn lane as Taylor Blvd approaches the Service Road on the south side of the MFC parking lot. …
To construct a communication tower, foundation for a prefabricated concrete building, parking garage, chain link fence, and perform ditch redevel…
The scope of the C-Area Ground Level Parking Project involves the alteration of two temporarygravel parking lots into a permanent asphalt parking lot…
The scope of the A7 Office Building project includes the design and construction of a multi-storyoffice building located within the parking lot in a …
The scope of the Knolls Laboratory Outfall 005 Maintenance and Repair Project willinclude the removal of sediment that has accumulated directly upstr…
During a preconstruction meeting, it was identified that approximately 5,000 yards of excess topsoil will be removed from the MFC parking lot to ma…
This EC revision includes a handful of scope additions. …
"The scope of the East End Land Acquisition (Minchoff Property) includes the initial procurement of the property and subsequent demolition, remova...