The scope of the A7 Office Building project includes the design and construction of a multi-storyoffice building located within the parking lot in a …
The scope of the Knolls Laboratory Outfall 005 Maintenance and Repair Project willinclude the removal of sediment that has accumulated directly upstr…
During a preconstruction meeting, it was identified that approximately 5,000 yards of excess topsoil will be removed from the MFC parking lot to ma…
This EC revision includes a handful of scope additions. …
"The scope of the East End Land Acquisition (Minchoff Property) includes the initial procurement of the property and subsequent demolition, remova...
"The scope of the CX Dump Tank Complex Demolition and Site Restoration project includes demolition of all of the components making up the CX Dump...
This revision captures changes to project scope. The proposed action no longer includes a new trench drain between buildings Test Area North (TAN)-…
The scope of the Waste Processing (WP) Building Demolition and Site Restoration project includes removal and disposal of the building, slab...
The purpose of this revision is to expand the scope of the parking area reconfiguration. The Materials and Fuels Complex (MFC) lacks adequate emplo…
The project includes replacement of the Firing Range ventilation system, replacement of the roof membrane to eliminate entry of precipitation into …