National Nuclear Security Administration (NNSA)’s proposed action is to 1) create temporary housing for occupancy 2) provide non-occupancy space fo…
The scope of the FSVTL and SVTF support facility project includes the construction of a multistory building extension to the north and/or west of the existing SVTF.
The Western Area Power Administration (vi APA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the …
The US Department of Energy (DOE) proposes to perform assessment, modernization, and upgrade of the existing sitewide utility systems at the Lawren…
KESSELRING SITE MARF DEFUELING AND ASSOCIATED DEFUELING FACILITY PROJECT
The Kesselring Site D1 G Ditch Remediation Project will remediate soil that is contaminated with silver, mercury, and polychlorinated biphenyls (PCBs), identified in the D1 G Ditch during characterization efforts, to agreed upon cleanup standards.
The Kesselring Site Southeast Quadrant Decontamination and Dismantlement Project will remediate, dismantle, and dispose of above and below grade structures and utilities associated with Building 5, Building 5A...
Implement stormwater erosion and sedimentation control improvements within the Savannah River Tritium Enterprise (SRTE) per Work Orders.…
The scope of the Component Test Complex project includes constructing a new facility and utility infrastructure required to support the Bettis Laboratory Thermal Hydraulics Laboratory testing which is currently located at Bettis in the Hangar 2 Building.
The US Department of Energy (DOE) proposes to perform mechanical replacements and/or upgrades to the Bldg. 43 compressed air and the Bldg. 2 coolin…