Science and User Support Building CX(s) Applied: B1.15, B1.23 Date: 04/06/2012 Location(s): California Offices(s): Stanford Linear Accelerator Site Office
Project S-234, Patrol Training Academy Firing Range Realignment CX(s) Applied: B1.15 Date: 03/28/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Darlington County Biodiesel Buses CX(s) Applied: A1, B1.15, B2.2, B5.22 Date: 02/24/2012 Location(s): South Carolina Offices(s): National Energy Technology Laboratory
Bettis Atomic Power Laboratory- MRTC Office Building CX(s) Applied: B1.15 Date: 02/22/2012 Location(s): CX: none Offices(s): Naval Nuclear Propulsion Program
Simulated Based Engineering User Center CX(s) Applied: B1.7, B1.15 Date: 02/08/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Construction of Parking and Laydown Areas in the Vicinity of Pads 717-14F, 263-95F, and 249-F. CX(s) Applied: B1.15 Date: 01/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Construction of Interagency Fire Center at TA-49 CX(s) Applied: B1.15 Date: 01/17/2012 Location(s): New Mexico Offices(s): Los Alamos Site Office
Construction of 37 Parking Spaces South of 251-4F CX(s) Applied: B1.15 Date: 01/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Parking Lot Construction North of Pad 717-14F CX(s) Applied: B1.15 Date: 01/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Support Buildings CX(s) Applied: B1.15 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office