B-33 Facility & Heating, Ventilation, and Air Conditioning Renovations CX(s) Applied: B1.3, B1.15 Date: 08/17/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Laydown Yard Expansion East of 706-1F CX(s) Applied: B1.15 Date: 08/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Power Monitoring System Installation CX(s) Applied: B1.3, B1.15 Date: 08/08/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Knolls Laboratory Q14 Sprinkler System Upgrade Project CX(s) Applied: B1.15, B2.2 Date: 08/03/2012 Location(s): New York Offices(s): Naval Nuclear Propulsion Program
Establish Laydown Yard East of 281-3F CX(s) Applied: B1.15 Date: 08/03/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Siting, Modifying and Operating Support Buildings CX(s) Applied: B1.15 Date: 08/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Buildings 12-64/12-84 Electrical Equipment Installation CX(s) Applied: B1.3, B1.15 Date: 07/25/2012 Location(s): Texas Offices(s): Pantex Site Office
Building 1 Renovation CX(s) Applied: B1.15, B1.16, B2.1, B2.2, B2.5 Date: 07/16/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
Solar TAC - Thermal Energy Storage Test Facility CX(s) Applied: A9, A11, B1.15, B3.6 Date: 07/12/2012 Location(s): Colorado Offices(s): Golden Field Office
Savannah River National Laboratory Building 735-13A Power Addition CX(s) Applied: B1.15 Date: 06/26/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office