CX-013664: Categorical Exclusion Determination

Fermi National Accelerator Laboratory- Industrial Complex Buildings Addition CX(s) Applied: B1.15Date: 04/02/2015 Location(s): IllinoisOffices(s): Fermi Site Office

Office of NEPA Policy and Compliance

April 2, 2015
Estimated Read Time   min
Fermi National Accelerator Laboratory- Industrial Complex Buildings Addition
CX(s) Applied: B1.15
Date: 04/02/2015
Location(s): Illinois
Offices(s): Fermi Site Office

The purpose of the proposed action/project is to build a high-bay addition to the existing Industrial Complex buildings. The flexible high-bay space that this facility would provide would meet the need for space capable of housing large component assembly, which is in growing demand.

Document(s) Available for Download