This Scope provides the labor, material, and services to install additional personnel office space and restroom for supporting new missions in K-Ar…
Remove four truck ramps utilized for KCRIMS transfer, regrade area, expand parking spaces, rework lighting and fire protection lines. September 20…
The CEBAF Renovation
The Emergency Operations Center (EOC) has operated beyond its expected lifetime and has become inadequate to provide necessary response for possibl…
Installation of a 110/208v back-up generator for Building 17. …
Replace the failing cooling tower for Buildings 23 and 24 with a new tower. …
Build a self-supporting metal structure with electrical charging stations & safety eye washes to centralize the charging of the site forklifts & ma…
Upgrade /Replace the primary electrical distribution infrastructure for the south quarter of the NETL-Albany, Oregon site to increase capacity, rel…
The project scope consists of constructing a new load center to upgrade the existing Load Center (LC) A & B at the Kesselring Site (KS).
WAPA proposes to demolish the existing building and construct a new building, with the intent to reuse the current foundation. The project also in…