The preliminary scope of the project includes the design, construction, and start-up of a facility of 38,000 to 45,000 GSF in a two to three story…
Five office trailers, one bathroom trailer and one handi-house in L-Area will be removed and replaced.…
SST will obtain perrnits, design and construct an annex to the Training and Cascade Oflice Iluilding (C-104) including site utilities, and associat…
The U.S. Department of Energy (DOE), Richland Operations Office (RL), Infrastructure and Services Division (ISD) proposes to construct a modular cl…
The U.S. Department of Energy (DOE), Richland Operations Office (RL), Infrastructure and Services Division proposes to construct a parking lot at t…
The purpose of the proposed action is to construct and operate a new 11,360 ft2, single-story Security Support Building at the Advanced Test Reacto…
The project includes replacement of the Firing Range ventilation system, replacement of the roof membrane to eliminate entry of precipitation into …
A pre-built 12’ x 32’ storage building with be set up northwest of 782-4G in the Burma Road area. The purpose of the building is to store EC&ACP chem
The Check Station Building at Crackerneck Wildlife Management Area and Ecological Reserve (CWMA&ER) is an open structure that provides South Caroli…
Remove existing roof layers of Building 5 (except roof decking) and replace with new roofing materials.…