B26 ground floor will be retrofitted from the main conference room down to the G22 area, carpet, lights, ceiling tiles, paint, etc. …
Due to the need for increased efficiency in accessing the Material Access Area (MAA), a modification for the 105-K Entrance Control Facility (ECF) …
The Department of Energy intends to fund operation and maintenance actions at the Sanford Underground Research Facility (SURF). Actions would be bo…
Installation of 6 New Trailers with Utilities and including sidewalks at 742-G Trailer Complex Area. …
This Scope provides the labor, material, and services to install additional personnel office space and restroom for supporting new missions in K-Ar…
Remove four truck ramps utilized for KCRIMS transfer, regrade area, expand parking spaces, rework lighting and fire protection lines. September 20…
The CEBAF Renovation
The Emergency Operations Center (EOC) has operated beyond its expected lifetime and has become inadequate to provide necessary response for possibl…
Installation of a 110/208v back-up generator for Building 17. …
Replace the failing cooling tower for Buildings 23 and 24 with a new tower. …