The Emergency Operations Center (EOC) has operated beyond its expected lifetime and has become inadequate to provide necessary response for possibl…
Fluor Idaho transferred the lease for TR-25 at the Materials and Fuels Complex (MFC) to Idaho National Laboratory (INL). …
New Pre-engineered metal building for the Forest Service. Activities include geotechnical survey, disposition of four existing trailers, and constr…
ATR is proposing to install a smoke shack between TRA-653 and TRA-662 in order to provide a shelter from the weather for smokers to smoke outdoors.…
Create an asphalt floor and entry/exit to quonset hut in the gravel lot north of the KAC main parking lot.…
To safely maintain the new outdoor transformer yard switchgear at the Advanced Test Reactor (ATR) Complex during inclement weather, the proposed ac…
Construction of pre-engineered metal building for the US Forest Service, including water, sewer, electrical, and communications tie-ins to existing…
The scope of the G Building East Renovation Project includes asbestos abatement of window caulking, floor tile and mastic.
Upgrades to the L-area vehicle barrier.…
The U.S. Department of Energy/National Nuclear Security Administration proposes to construct and maintain a new multi-level parking structure (appr...