The scope of the Knolls Laboratory Building M11 Construction Project includes thedesign and construction of an approximate 40,000 square foot, mult...
Construct two new storage pads at the north end of the ATR Complex forheavy equipment and other non-radiological material storage and for low-level…
The Knolls Laboratory Building C7 Construction Project covers the design and construction of a new facility to increase space available to support...
As part of the Nile Ave resurfacing effort, large sections of existing road base material will need to be replaced.…
This revision addresses the proposed installation of a 12 by 40 ft trailer in a 6,000 ft2 area to support construction activities at the Specific M…
There are 5 projects proposed as Supplemental Environmental Projects, SEPs, to settle the penalty for DOE-ID in connection with the settlement of a…
Knolls Laboratory-Chemistry Laboratory and Radiological Health Facility, Building T3, Construction Project
The design proposes that a gutter will be installed under each joint at the upper level.…
The project plans to add a turn lane as Taylor Blvd approaches the Service Road on the south side of the MFC parking lot. …
To construct a communication tower, foundation for a prefabricated concrete building, parking garage, chain link fence, and perform ditch redevel…