The purpose of the proposed action is to construct and operate a new 11,360 ft2, single-story Security Support Building at the Advanced Test Reacto…
The project includes replacement of the Firing Range ventilation system, replacement of the roof membrane to eliminate entry of precipitation into …
A pre-built 12’ x 32’ storage building with be set up northwest of 782-4G in the Burma Road area. The purpose of the building is to store EC&ACP chem
The Check Station Building at Crackerneck Wildlife Management Area and Ecological Reserve (CWMA&ER) is an open structure that provides South Caroli…
Remove existing roof layers of Building 5 (except roof decking) and replace with new roofing materials.…
The 180 kW emergency diesel generator for the Fuels and Applied Science Building (FASB) at the Materials and Fuels Complex (MFC) building MFC-787 n…
The purpose of this revision is to capture additional project scope. The repaving project required a temporary turn-around location to accommodate …
Trailers are to be moved to support Saltstone Disposal Unit 7 construction.…
N&HS requires additional field office space in the CITRC area for use by multiple programs. The trailer will supply valuable square footage for tra…
Installation of Tornado Shelter…