This EC revision includes a handful of scope additions. …
The purpose of this Environmental Checklist (EC) is to address the redesign and installation of the new Advanced Test Reactor (ATR) Low Pressure Ai…
"The scope of the East End Land Acquisition (Minchoff Property) includes the initial procurement of
the property and subsequent demolition, remova...
the property and subsequent demolition, remova...
The U.S. Department of Energy (DOE), Richland Operations Office (RL), Security, Emergency Services & Information Division proposes to modify suppor…
Deployment of new trailers, septic system, and extended personnel and delivery truck parking to support Z-Area 24X7 operations.…
The Mission Support Contractor (MSC) and its subcontractors perform siting, construction or modification, and operation of support buildings and su…
In 2016, Power Management identified the need to store heavy equipment indoors during adverse weather conditions. …
DOE LM is proposing to conduct the following ongoing operations activities and routine maintenance actions at the DOE LMBC, a U.S. General Services…
Proposed activity will reconfigure and remodel 226-2F to support use as a training and operations support facility.…
Construction of Prefabricated metal building, potable water line, and septic/drain field, and installation of two evaporators.…