BPA proposes to allow Clark PUD to remove transmission line conductors on one of their 7.2kV distribution lines where it crossed BPA ROW between To…
Funding will support the project team's research and development of an electric power system (EPS) with high power delivery and low system mass for…
The project team will use the additional funds to continue development, refinement, and testing of their prototype electric motor system. If succes…
This EEC is for the placement of grout inside manhole P5 of the abandoned process sewer line north of 211-H.…
This activity will assess the use of specialized test kits for measurement of hexavalent chromium and to determine detection limits that can be ach…
The 786-5A Trailer is an older structure (Occupied) and needs all the windows repaired from water intrusion by leaking windows. Additional building…
University led study to assess industrial wastes that can be used for effective, safe, economical, and long-term storage of carbon dioxide (CO2) th…
Complete an initial engineering design study including an AACE Class 4 cost estimate for installing a CO2 capture facility at Filer City to capture…
The project team will increase the system power and shaft speed of their current prototype engine. If successful, the development of more powerful …
The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is proposing to drill and install 14 groundwater monitoring wells at the Tuba …