The potential for environmental improvement noted in the research proposal refers to the fact that our research plan involves discussion of climate…
Renovate conferences rooms and adjacent corridors, entries, restrooms, and kitchenette in B-922 at NETL Pittsburgh, PA.…
Hot work activities using small handheld butane or methane/oxygen torches – including general glass work (e.g., fire polishing, bending, connecting…
Bonneville Power Administration (BPA) proposes to replace an existing two-pole suspension structure and associated structural and electrical compon…
Bonneville Power Administration (BPA) proposes to upgrade two radio station sites with new antennas and equipment. This CX has been updated to incl…
A concrete pad and pre-fabricated picnic shelter will be erected at the SREL Conference Center.…
Install Pizza Ovens in 766-H.…
Replace walkway (footbridge) at 645-4N.…
Pour new concrete pad at 713-N roll-up door.…
The 711-4N Lead Melter Complex includes a lead melter (10,000 lb) and supporting structures (dress-out hut, machining/tooling booth, material stora…