Funding will support the project team's small-scale research and development of an Autonomous Intelligent Assistant (AutonomIA) by combining artifi…
Isolation and removal of several pieces of equipment originally used by MOX from Building 226-2F to Building 717-F or to Building 711-1N for storag…
Conference Room 32 in Building 234-H is going to be equipped with TV and Projector. The installation of two receptacles is going to be used to powe…
Review of Work Order tasks 1949521-01, Remove Asbestos Floor Tiles in 234-H, Rm 222 and 1950583-02, Remove/Replace Floor tiles and Paint Walls in 2…
The Furnace 100 Process Chilled Water has been shown to be overly acidic for its process function and needs to be drained.…
Augusta Industrial will clean up and dispose of bird droppings in SRTE, Building 232-H Truckwell.…
Replace HVAC Heat Pumps and Air Handling Units for Buildings 247-H and 248-H. Existing units are original components and have reached the end of th…
This project will provide a new exhaust system (2 Fans), a small electrical building, a stack, and a new diesel generator for 234-7H and will blank…
TCAP Column B, along with TCAP Product Storage Bed A are to be replaced by new components.…
The scope of this task will replace the diesel engine and generator and consolidate and or replace the existing 4 Motor Control Centers (MCCs) in B…