In this final rule, DOE establishes new energy conservation standards for Dehumidifying Direct-Expansion Dedicated Outdoor Air Systems.
The Proposed Activity is to remove both of the stack pipes for 782-5M and 782-6M soil vapor extraction units for both safety and cost savings.…
Isolation and removal of several pieces of equipment originally used by MOX from Building 226-2F to Building 717-F, to Building 711-1N or to availa…
The existing bubbless system to measure tank liquid levels are causing numerous unscheduled maintenance outages. The proposed solution is to replac…
A Network Operating Agreement between the City of New Madrid (Customer), Southwest Power Pool (Provider) and Southwestern Power Administration (Hos…
Transport, Receipt, and Unloading of Samples from VC Summer. Rev. 2 Added returnig samples to glass vials, where the vials will be subsampled using…
Inert glovebox operations in 786-A to support R and D in which air sensitive material will be handled. This EEC captures only the operations around…
Propane supplied from the Flammable Gas Distribution System (FGDS) is no longer required throughout the facility and is only required for operation…
This demonstration project proposes to drill two horizontal enhanced methane capture pilot wells along the Fruitland Formation Coal Outcrop. …
The existing gel cell batteries used for the Tritium Extraction Facility (TEF) diesel generator are no longer available from the supplier. The curr…