City of Dover to hire contractors to construct and commission an electric substation at the Garrison Oak Business and Technology Park.…
Demolish and remove (D and R) 719-H South (front) and West (side) exterior double doors, frames (if needed), and lock assemblies.…
This project aims to design and construct a working water vapor detritiation unit for the passive for example, ambient condition) recovery of accum…
Disassemble, sort, and dispose of legacy RAD equipment located at the Salvage Yard.…
There is currently an installed Breathing Air (BA) header that feeds in portable BA through the hatch wall and ceilings to various locations in the…
Design, fabricate, and install one new Non-Nuclear Reconfiguration (NNR) Calorimeter to replace the NNR in 234-H. The NNR Calorimeter has been in s…
Building 233-H Doors 301/08 are old and heavy, and their hinges require frequent maintenance.…
H-12 chemical addition system corrective maintenance. Humate is added to H-Canyon NPDES H-12 flow prior to discharging through Outfall H-12. The ma…
Remove and replace the recorder per work instructions and J-DCF-L-00072. The recorder is old and obsolete, and the manufacturer is no longer able t…
M-DCF-H-13025 is to install a TIDS sample point on to NEVAC Tank B. The sample point would allow for sample bombs to be connected to NE-TB to colle…