Removal of electrical to door 313 and 320 in 105-L and door 313 to be removed from building.…
A more suitable location to gauge field parameters at station L3R1-A was identified. The following activities will take place to establish the new …
Comprehensive Force-on-Force (CFoF) exercises that are conducted by Centerra-SRS are as realistic as possible and conducted in a safe manner.…
This EEC addresses three general activities associated with the remediation of the Lower Three Runs (LTR) Integrator Operable Unit (IOU): 1) Sedime…
D and R the abandoned heat recovery coil in the fan supply unit located in building 735-11A, Room 201. Replace the steam and chill water coils in t…
Replace defective Vessel Vent System duct heater and control panel in building 776-4A. VVS duct heater to be removed will contain internal radioact…
Bonneville Power Administration (BPA) proposes to provide funding to support implementation of the Yakama Nation Fisheries (YN) Scaffold Camp Flood…
Bonneville Power Administration (BPA) proposes to construct a new 500/230-kilovolt (kV) Longhorn Substation, which would also require some modifica…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road and transmission line right-of-way (…
LM is proposing to conduct routine activities at the LMFSC.…