Categorical Exclusion (CX) Determinations By Date

Project team will conduct a Front-End Engineering and Design study of a pipeline system routing from gulf coast of LA to the central gulf coast of …
HVAC No. 2 for 211-8H Control Room is being replaced with a new (like for like) unit (WO No.2009200). Replacement will include replacing existing n…
This EEC will cover the repair of HB-Line exterior wall near the roof drainpipes to restore the damaged concrete to the original design capacity, t…