Southwestern proposes to update the existing Integrated System Rate Schedule for the Wholesale Rate for Hydro Peaking Power Rate Schedule P-13B.…
The proposed action includes two phases. In Phase I, we will collect a geotechnical boring. In Phase II, we will drill a hole in the ground and col…
Perform Section 432 of the Energy Independence and Security Act of 2007 Energy and Water Evaluations at the NETL Morgantown and Pittsburgh Sites. S…
The Idaho National Laboratory (INL) Wireless Test Bed (WTB) USG 121 Customer has requested the use of the INL test range, and off-site areas surrou…
Mixing Cu alloys, spray coating molten Cu with Gr or Ni-Gr in midair, rolling/extrusion, electrical conductivity testing, microstructure characteri…
Fundamental research on cybersecurity of electric power systems. R and D in Phase I (two years) and Demonstration in Phase II (1 year).…
The Bonneville Power Administration (BPA) is proposing to allow Portland General Electric (PGE) to build a portion of their new Horizon-Keeler 230-…