Southern LNG requests authorization to export this LNG in a volume equivalent to 182.5 billion cubic feet (Bcf) of natural gas on a cumulative basis for a two-year period commencing on April 1, 2023.
The proposed stormwater and industrial water improvements are designed to meet current industrial permit limits and prepare for future development at the Bettis Laboratory Site.
DCF and associated work order to repair the bottom of P68 manhole and raise it to grade for easier access in the future.…
The proposed action includes two phases. In Phase I, we will collect a geotechnical boring. In Phase II, we will drill a hole in the ground and col…
The proposed action includes two phases. In Phase I, we will collect a geotechnical boring. This involves a specialized drill rig that drills a hol…
The project seeks to advance a novel high-capacity structured sorbent (HCSS) comprising a highly dispersed sorbent with a low-pressure drop substra…
The U.S. Department of Energy (DOE) administers the annually appropriated State Energy Program (SEP) as authorized by Title III, Energy Policy and …
The U.S. Department of Energy (DOE) is proposing to provide funding to GE Research to develop, build, and field-test a multi-port converter interfa…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 15/1-15/7 and 16/1 on the Rosedale-K…
Southwestern proposes to update the existing Integrated System Rate Schedule for the Wholesale Rate for Hydro Peaking Power Rate Schedule P-13B.…