Subcontractor will provide roof repairs to stop leaks at 735-4B.…
A research project focused on the effects of vegetation distribution on fire behavior and smoke plume development. In one 1-hectare plot, researche…
Subcontractor will perform a roof replacement on 192-2K. The Subcontractor will disturb the existing roof on 192-2K.…
Install plug in sewer manhole to isolate 284-H from the sanitary sewer system.…
Modification of Test Console Vent Piping in 221-33F.…
Rainwater has entered C-Area and collected in sump 216-C. Due to the nature of the former processes in C-Area the water is anticipated to be tritia…
Install UW drops for cubicle replacement in 703-43A.…
The U.S. Department of Energy proposes to transport large equipment (a transformer and ancillary equipment) from Sandia National Laboratories (SNL)…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to acquire 4.27 acres of privately-owned land for construction of t…
Develop a lab-scale system to mineralize CO2 from a simulated flue gas via reaction with real and simulated brines and create building materials.…