This activity provides analytical support for RIC research projects. This lab covers analytical services for Pittsburgh, Morgantown, and Albany. Wo…
Purchase, excavation, construction, and installation of a 5MW/20 MWh battery backup system in Estes Park, Colorado. This will be used to serve 4 cr…
Purchase a Caterpillar 305 mini excavator, flail mower, mesh guard kit and Behnke trailer to allow the utility to clear the ROW. …
CX-030050: Ault Substation Reactor Replacement and Hygiene and Windsor Substation Switch Replacement
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace equipment at Ault (AU), and Windsor (WND) substations in…
Bonneville Power Administration (BPA) proposes to remove the tops from approximately 16 trees that are currently either blocking, or at risk of blo…
The Bonneville Power Administration (BPA) proposes to fund the Pacific Northwest National Laboratory (PNNL) and Columbia River Estuary Study Taskfo…
Bonneville Power Administration (BPA) proposes to remove, replace, upgrade, and/or modify outdated equipment at Columbia Substation. BPA would perf…
CX-032509: Ault Substation Reactor Replacement and Hygiene and Windsor Substation Switch Replacement
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace equipment at Ault (AU), and Windsor (WND) substations in…
HTRL Lab 134 is a laboratory used by the Hydrogen Isotopic Processing Section for hydrogen related research and development activities. …
The objective is to react the uranium oxides with HCl to form uranium chloride compounds distributed in the molten carrier salt. The off gas will b…