D and R the abandoned heat recovery coil in the fan supply unit located in building 735-11A, Room 201.…
Spent Fuel Project Operations with Construction support to open the 204 Tank and 205 Tank to sample heavy water for disposal modeling. Work will be…
This activity details the general operation of the FormLabs SLA resin 3D printers (Form2 and Form3 variations) along with the post-processing tasks…
An N and HS Sponsor requires a remote communications facility for testing and training at Cell Site 6 - INL/CITRC/ARA (43032'00"N 112049'50"W). The…
The U.S. Department of Energy (DOE) is proposing to provide funding to StorEdgeAI to develop and test a novel solar-powered non-wire energy carrier…
The U.S. Department of Energy (DOE) is proposing to provide funding to the Colusa Indian Community Council (CICC) to install two ground-mounted sol…
The ULTIMATE Phase 2 Program seeks to investigate selected alloy compositions and coatings to evaluate a comprehensive suite of physical, chemical,…
The Recipient will perform R and D by demonstrating feasibility of conversion of >10 Kg/day carbon dioxide to a special formulation of high-perform…
The project will replace the heating, ventilation, and air conditioning equipment, including the Energy Recovery Unit (ERU) and selective heat pumps (15). The Evaporative Cooler will also be replaced.
Replacement of the DFT is required in order to minimize the potential for interruptions to the steam service at KS.