Bonneville Power Administration (BPA) proposes to fund the Wahtum Creek Culvert Replacement and Fish Passage Project (Project) which would be imple…
Bonneville Power Administration (BPA) is proposing to remediate a slide along the Port Angeles-Sappho No. 1 transmission line. The slide is placing…
Bonneville Power Administration (BPA) proposes to allow Kessi Consulting to install a new underground sewer line on BPA fee-owned right-of-way (ROW…
BPA would be selling the East Hills Substation to South Side Electric. The new change of ownership at East Hills Substation would be the point at …
Project management, modeling work, design and testing of a sub-scale sorbent capture bed and weak-acid regeneration system to demonstrate carbon di…
The U.S. Department of Energy (DOE) is proposing to provide funding to the University of Georgia (UGA) to design, fabricate, characterize, and test…
The U.S. Department of Energy (DOE) is proposing to provide funding to Palo Alto Research Center LLC (PARC) to create a gas detection system compri…
The Project is a rebuild of six (6), 161 kV overhead transmission lines from the Gridliance Joppa 161 kV switchyard to the TVA Shawnee Station and LGE Grahamville 161 kV substations.
Preliminary Real Estate Plans, applicable to all easements related to Building 23 (examples: electricity transmission-Evergy, natural gas-Spire, an…
This document covers the support activities of equipment rental, purchase of materials (pipe casing, etc.) and services under FFPO supervision for …