Bench-scale studies, and design, engineering, fabrication and demonstration of a first-of-a-kind (FOAK) 100-kW flow electrolyzer for simultaneous a…
The HMI ("Signal" software running on Windows 7 PC) for the HVAC system at the 2H control room building is obsolete and unreliable. This HMI platfo…
Assess the feasibility of volume, long-term storage of hydrogen in the subsurface through data collection
1) Studying composition of biomass ash and building a prototype for biomass ash leaching Optimization of biomass ash leaching building a prototype…
Conduct Methane sensing survey at Coal Basin using drone, helicopter or ground-based methods. Deploy stationary methane sensing devices to measure…
A prototype vapor recovery device will be tested using a mix of gases including propane to assess material balance and operational conditions for t…
Revision 4: Additional scope of approximately 930 LF of 6" diameter Fire Water line and 4 new Fire Hydrants, tied into existing Fire Water system. …
SREL is creating a new laboratory space in building 737-18A to be used for radiological research.…
EEC covers the Real Estate Lease, siting, construction, utility installation and operation of the Verizon-SRS ll Cell Tower and appurtenances adjac…
A new Isolator Inert Glovebox (GB) and supporting gas services are to be installed in Building 723-15A, Metal Printing Laboratory. It will be used …