The disconnect in Air Handling Unit number 7 will be replaced. The work will be performed by F-Area Complex E and I.…
The EEC covers the renovations for the interior of building 713-1N.…
Recovering refrigerant from non-radiological appliances in L-Area that contain t
The purpose of this activity is to produce berl saddles coated with silver nitrate for iodine volatization studies.…
Replace High Pressure Sodium (HPS) Lamps with LED.…
Replace existing Transuranic Waste Pad 3 high-pressure sodium lights (12) with LED light fixtures.…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
704-1N Remove floor tile and coat floor in Room 140. Remove existing carpet and install new carpet in 704-1N Room 118.…
This EEC is to cover changing generator SRO5579 to a RICE unit.…
Administrative and project management activities