Dry Pipe Sprinkler Piping Replacement Projects CX(s) Applied: B1.3Date: 05/14/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
High-Pressure Cryogenic Pump and Hydrogen Filling Station CX(s) Applied: B5.15Date: 05/14/2012 Location(s): CaliforniaOffices(s): Lawrence Livermore Site Office
Protection Upgrades Project CX(s) Applied: B1.3, B1.7, B1.27Date: 05/14/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
Pilot Testing: Pretreatment Options to Allow Re-Use of Flowback Water CX(s) Applied: A9, B3.6 Date: 05/14/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Pilot Testing: Pretreatment Options to Allow Re-Use of Frac Flowback Water CX(s) Applied: B3.6 Date: 05/14/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Milling Machine Replacement Projects CX(s) Applied: B1.31 Date: 05/14/2012 Location(s): Tennessee Offices(s): Y-12 Site Office
Dry Pipe System Sprinkler Piping Replacement Projects CX(s) Applied: B1.3 Date: 05/14/2012 Location(s): Tennessee Offices(s): Y-12 Site Office
High-Pressure Crogenic Pump and Hydrogen Filling Station CX(s) Applied: B5.15 Date: 05/14/2012 Location(s): California Offices(s): Lawrence Livermore Site Office
Advanced Test Reactor (ATR) Primary Coolant System (PCS) Relief Valves Monorail System CX(s) Applied: B1.31 Date: 05/14/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Install New Parking Lot Area Over Old Concrete Slab by Daycare at Morgantown National Energy Technology Laboratory Site CX(s) Applied: B1.15, B1.24 Date: 05/11/2012 Location(s): West Virginia Offices(s): National Energy Technology Laboratory