Upgrade of the Secondary Containment System at Bonneville Power Administration’s (BPA) Santiam Substation CX(s) Applied: B4.6 Date: 05/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Install Two Pre-engineered Canopies CX(s) Applied: B1.15 Date: 05/30/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 05/30/2012 Location(s): Washington Offices(s): National Energy Technology Laboratory
Optimization of Microwave Telecommunication System ON Line Nevada Transmission Project, f.k.a. Southwest Intertie Project - South CX(s) Applied: B1.19, B4.6 Date: 05/29/2012 Location(s): Nevada Offices(s): Loan Guarantee Program Office
Water Tanks Demolition and Deactivation Projects CX(s) Applied: B1.23Date: 05/29/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
Establish Laydown Yard Northeast of MOX Services Concrete Batch Plant CX(s) Applied: B1.15 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Construction of a Metal Carport Structure CX(s) Applied: B1.15 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Establish Laydown Yard East of 281-3F CX(s) Applied: B1.15 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
One Nevada Optimization of Microwave Telecommunication System CX(s) Applied: B1.19, B4.6 Date: 05/29/2012 Location(s): Nevada, Offices(s): Loan Guarantee Program Office
Excavate to Repair Underground Domestic Water Leak between Tanks 5 and 7 CX(s) Applied: B1.3 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office