Groundwater Monitoring Well Installation at Mixed Waste Management Facility CX(s) Applied: B3.1 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Route Phase II Column Transfer Piping To Canyon Tank 11.1 CX(s) Applied: B2.5 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Construct Administrative Support Building at Three Rivers Solid Waste Authority CX(s) Applied: B1.15 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Bonneville Power Administration (BPA) Acquisition of Oregon Trail Electric Cooperative Disconnect Switch at the BPA LaGrande Substation CX(s) Applied: B1.24 Date: 05/16/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Wood Pole Replacements As Needed on the Naselle-Tarlett No. 1, Holcomb- Naselle No. 1, and Raymond-Willapa River No. 1, 115 Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): Washington Offices(s): Bonneville Power Administr...
Revolution Energy Services (RES) Agriculture (Ag) – Forest Glen Oaks LLC Biomass Project CX(s) Applied: B4.13 Date: 05/16/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Replacement of A-Area Critical Fire Hydrant 3038 CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Re-supply of Electrical Loads Fed from 192-K & 183-3K CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Fire Pumps Replacement at the K-Area Complex CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Prepare and Seal Exterior of Dry Room, Building 735-A CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office