Archer to Ault 230 Kilovolt Transmission Line Structure Replacement, Weld County, Colorado CX(s) Applied: B1.3 Date: 05/09/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Western Area Power Administration and Tri-State Generation and Transmission Association, Inc. Fiber Optic Installation Project From Beaver Creek to Big Sandy Substations Morgan, Washington, and Lincoln Counties, Colorado CX(s) Applied: B1.3 Date: 05/0...
Information Operations & Research Center (IORC) Room E-6 Air Conditioner Unit Installation CX(s) Applied: B1.4 Date: 05/09/2012 Location(s): Idaho Offices(s): Idaho Operations Office
X-608 Well Field Transfer CX(s) Applied: B1.24 Date: 05/09/2012 Location(s): Ohio Offices(s): Portsmouth Paducah Project Office
730-1B 3rd Floor Office Renovation CX(s) Applied: B1.3 Date: 05/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Clean, Seal, and Paint West Hackberry Buildings RW MCC 392, Substation 390 and MCC 317 CX(s) Applied: B1.3 Date: 05/08/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
Reintroduction of Westslope Cutthroat Trout in the Pend Orielle basin CX(s) Applied: B1.20 Date: 05/07/2012 Location(s): Washington Offices(s): Bonneville Power Administration
High Performance Reflector Panels for Concentrating Solar Power Assemblies - Thermata CX(s) Applied: B3.6 Date: 05/07/2012 Location(s): Pennsylvania Offices(s): Golden Field Office
Excavate New Storm Drainage Ditch to Divert Storm Water from A-Area Coal Yard to Outfall A-11 Catch Basin CX(s) Applied: B6.1 Date: 05/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replacement of A-Area Critical Fire Hydrants 3001, 3013, 3018, & 3032 CX(s) Applied: B1.3 Date: 05/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office