Alvey Substation 115-kilovolt and 230-kV Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/14/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Chevron Methane Leak Test CX(s) Applied: B3.1, B3.2, B3.11 Date: 06/13/2013 Location(s): Wyoming Offices(s): RMOTC
Simulant Liquid Ion Exchange Column Test CX(s) Applied: B3.6 Date: 06/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Monroe-Snohomish Expanded Conductor Replacement CX(s) Applied: B4.6 Date: 06/13/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Pilot Butte-La Pine #1 Wood Pole Replacements CX(s) Applied: B1.3 Date: 06/13/2013 Location(s): Oregon Offices(s): Bonneville Power Administration
Microbiological & Biomedical Research in the 300 Area - 2013 CX(s) Applied: B3.12 Date: 06/13/2013 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Small Scale Research and Development, Laboratory Operations, and Pilot Projects in the 300 Area - 2013 CX(s) Applied: B3.6 Date: 06/13/2013 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Routine Maintenance in the 300 Area - 2013 CX(s) Applied: B1.3 Date: 06/13/2013 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Siting, Modifying and Operating Support Buildings on the Hanford Site - 2013 CX(s) Applied: B1.15 Date: 06/13/2013 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Site Characterization and Environmental Monitoring on the Hanford Site - 2013 CX(s) Applied: B3.14 Date: 06/13/2013 Location(s): Washington Offices(s): River Protection-Richland Operations Office