Independent Energy Community Renewable Power System CX(s) Applied: B5.15 Date: 12/02/2013 Location(s): Utah Offices(s): Golden Field Office
Office of NEPA Policy and Compliance
December 2, 2013Independent Energy Community Renewable Power System
CX(s) Applied: B5.15
Date: 12/02/2013
Location(s): Utah
Offices(s): Golden Field Office
The Department of Energy is proposing to provide funding to Pleasant Grove City, Utah to evaluate, design, test, install, and monitor a micro-hydroelectric generation system. The proposed facility would be located within Pleasant Grove's Battle Creek Water Storage and Flow Control Complex and utilize existing municipal infrastructure and resources.
CX(s) Applied: B5.15
Date: 12/02/2013
Location(s): Utah
Offices(s): Golden Field Office
The Department of Energy is proposing to provide funding to Pleasant Grove City, Utah to evaluate, design, test, install, and monitor a micro-hydroelectric generation system. The proposed facility would be located within Pleasant Grove's Battle Creek Water Storage and Flow Control Complex and utilize existing municipal infrastructure and resources.