CX-011613: Categorical Exclusion Determination

Bald Mountain Fiber Optic Splice Temporary Pad CX(s) Applied: B1.15 Date: 12/11/2013 Location(s): Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

Office of NEPA Policy and Compliance

December 11, 2013
Estimated Read Time   min
Bald Mountain Fiber Optic Splice Temporary Pad
CX(s) Applied: B1.15
Date: 12/11/2013
Location(s): Colorado, Colorado
Offices(s): Western Area Power Administration-Rocky Mountain Region

Western Area Power Administration proposes to construct a temporary trailer pad at structure 1/8 on its Flatiron-Pole Hill 115-kilovolt Transmission Line located approximately 6-miles west of Loveland, Colorado. The temporary trailer pad is to provide a level surface for a fiber optic service trailer that is periodically required to service a fiber optic splice box located on the transmission line pole structure.