Midway Substation 230 Kilovolt Upgrades El Paso County, Colorado CX(s) Applied: B4.6, B4.11 Date: 07/25/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Deactivation and Decommissioning of the D-Area Detritiation Cells and Relocation of Associated Handi-Houses CX(s) Applied: B1.23 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Characterization of Downgradient Volatile Organic Compounds Plume and Installation of Monitoring Well CX(s) Applied: B3.1 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Installation of Sentinel Wells ASB011B/011C for A-2 Air Stripper Shutdown CX(s) Applied: B3.1 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Disassemble and Remove Tritium Facility Perimeter Intrusion Detection And Assessment System CX(s) Applied: B2.2 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Installation of Roofing System on L Area Complex Building, Sections +91 and +148 CX(s) Applied: B1.3 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Dismantle and Remove Low Level Waste Loading Station, Building 735-A CX(s) Applied: B1.23 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Analytical Development Wet Chemistry Methods CX(s) Applied: B3.6 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
South Dakota Program year 2012 State Energy Plan CX(s) Applied: A9, A11 Date: 07/24/2012 Location(s): South Dakota Offices(s): Golden Field Office
Idaho Program Year 2012 State Energy Program Formula Grants CX(s) Applied: A9, A11 Date: 07/24/2012 Location(s): Idaho Offices(s): Golden Field Office