Categorical Exclusion (CX) Determinations By Date

Qualification of Flexible Reinforced Pipe for 10,000 Foot Water (Phase One and Two) CX(s) Applied: A9, B3.6 Date: 07/12/2012 Location(s): Multiple Offices(s): National Energy Technology Laboratory
Zonal Isolation Improvement for Horizontal Wells Drilling in the Marcellus Shale CX(s) Applied: A9, A11, B3.6 Date: 07/12/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
High Frequency Sounder - Permanent Installation at Water Reactor Research Test Facility CX(s) Applied: B1.19 Date: 07/11/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Big Eddy – Troutdale No. 1 230 Kilovolt Transmission Line Upgrade CX(s) Applied: B4.13 Date: 07/11/2012 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration