Hydrogen Charging Tritium Contaminated Metals CX(s) Applied: B3.6 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Hills Creek-Lookout Point No. 1 Wood Pole Replacements CX(s) Applied: B1.3 Date: 07/19/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
St. Petersburg Solar Pilot Project CX(s) Applied: B5.1 Date: 07/19/2012 Location(s): Florida Offices(s): Golden Field Office
Schultz-Raver No.1 Right-Of-Way Marking Project CX(s) Applied: B1.3 Date: 07/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Olympia-Grand Coulee Structure 85/5 Relocation Project CX(s) Applied: B1.3 Date: 07/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Geothermal Technology Advancement for Rapid Development of Resources in the U.S. CX(s) Applied: A9, B3.2, B3.11 Date: 07/19/2012 Location(s): Texas Offices(s): Golden Field Office
Hot Springs Substation Gravity Drain Install CX(s) Applied: B4.6 Date: 07/19/2012 Location(s): Montana Offices(s): Bonneville Power Administration
Recovery Act: Hybrid Ground Source Heat Pump System in Tennessee K-12 Schools CX(s) Applied: A9, B2.1, B5.19 Date: 07/19/2012 Location(s): Tennessee Offices(s): Golden Field Office
Small Scale Electrical Power Generation from Heat Co-Produced in Geothermal Fluids: Mining Operation CX(s) Applied: B3.1, B5.15 Date: 07/19/2012 Location(s): Nevada, Nevada Offices(s): Golden Field Office
Acoustic Monitoring of Beluga Whale Interactions with Cook Inlet Tidal Energy Project CX(s) Applied: B3.3 Date: 07/19/2012 Location(s): Alaska Offices(s): Golden Field Office