Nashua-Plainfield Community Schools Geothermal System CX(s) Applied: B5.19 Date: 07/26/2012 Location(s): Iowa Offices(s): Golden Field Office
Line Switch Replacements at Chappell and Julesburg Taps in Deuel County, Nebraska and Kersey Tap in Weld, Colorado CX(s) Applied: B4.6, B4.11 Date: 07/25/2012 Location(s): Nebraska, Colorado Offices(s): Western Area Power Administration-Rocky Mountain...
Optimizing and Quantifying Carbon Dioxide Storage Capacity/Resource in Saline Formations and Hydrocarbon Reservoir CX(s) Applied: A9 Date: 07/25/2012 Location(s): North Dakota Offices(s): National Energy Technology Laboratory
Wisconsin Clean Transportation Program CX(s) Applied: A1, B5.1 Date: 07/25/2012 Location(s): Wisconsin, Minnesota, Illinois Offices(s): National Energy Technology Laboratory
Concrete Culverts Storage in K-Area CX(s) Applied: B1.30 Date: 07/25/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Pilot Scale Hanford Mixing Studies with Cohesive Simulants, Phase III, and Solids Accumulation Scouting Studies CX(s) Applied: B3.6 Date: 07/25/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Operation of 3013 Outer Can Welder (OCW) CX(s) Applied: B1.3 Date: 07/25/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Oregon State University- Natural Gas Self-contained Home Filling Station CX(s) Applied: B3.6 Date: 07/25/2012 Location(s): Oregon, Colorado, Michigan Offices(s): Advanced Research Projects Agency-Energy
Buildings 12-64/12-84 Electrical Equipment Installation CX(s) Applied: B1.3, B1.15 Date: 07/25/2012 Location(s): Texas Offices(s): Pantex Site Office
Advance Manufacture of Second-surface, Silvered Glass Reflectors for High Performance, Low-cost Concentrated Solar Power Collector Systems CX(s) Applied: B3.6 Date: 07/25/2012 Location(s): Arizona Offices(s): Golden Field Office