CX-012202: Categorical Exclusion Determination

Advanced Test Reactor (ATR) Complex Camera Tower Installation CX(s) Applied: B2.2 Date: 05/22/2014 Location(s): Idaho Offices(s): Nuclear Energy

Office of NEPA Policy and Compliance

May 22, 2014
Estimated Read Time   min
Advanced Test Reactor (ATR) Complex Camera Tower Installation
CX(s) Applied: B2.2
Date: 05/22/2014
Location(s): Idaho
Offices(s): Nuclear Energy

Install new 30 foot tall camera tower with 6 foot square concrete mounting base in the northwest corner of the ATR perimeter in the perimeter isolation zone as part of the facility surveillance equipment.