Tacoma Communication Site Engine Generator Replacement CX(s) Applied: B1.3 Date: 06/19/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Northwest National Marine Renewable Energy Center CX(s) Applied: B5.25 Date: 06/19/2014 Location(s): Oregon, Washington, Washington Offices(s): Golden Field Office
Establish 0.1 mg/L Cu as a target value for the ETP H Retention Basin (HRB) influent per a deviation to the ETP Waste Acceptance Criteria (WAC). CX(s) Applied: B3.1Date: 41809 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation of Solar Photovoltaic Systems CX(s) Applied: A9, B5.16 Date: 06/18/2014 Location(s): Wisconsin, Wisconsin Offices(s): Golden Field Office
Hydro Research Foundation University Research Awards - University of Tennessee CX(s) Applied: B3.3 Date: 06/18/2014 Location(s): Tennessee Offices(s): Golden Field Office
Process Water Instrument Air System Reconfiguration at 284-H CX(s) Applied: B1.3Date: 41808 Location(s): South CarolinaOffices(s): Savannah River Operations Office
FRAPPE and DISCOVER-AQ Experiments CX(s) Applied: A9, A11, B3.1 Date: 06/17/2014 Location(s): Colorado Offices(s): Golden Field Office
Lease Extension for Parcels of Land Within the Boundaries of Lawrence Berkeley National Laboratory CX(s) Applied: B1.24Date: 41807 Location(s): CaliforniaOffices(s): Berkeley Site Office
Deer Park Substation Connection Modifications CX(s) Applied: B4.11 Date: 06/17/2014 Location(s): Washington Offices(s): Bonneville Power Administration
Remove Two Sets of Railroad Tracks on Road D in A-Area CX(s) Applied: B1.3Date: 41807 Location(s): South CarolinaOffices(s): Savannah River Operations Office