Fundamental Investigations and Rational Design of Durable, High-Performance Cathode Materials CX(s) Applied: B3.6 Date: 08/23/2012 Location(s): Georgia Offices(s): National Energy Technology Laboratory
Midstate Electric Cooperative, Inc, Integration Request, Line and Load Interconnection Request L0296 CX(s) Applied: B4.11 Date: 08/23/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Railroad Island Property Funding CX(s) Applied: B1.25 Date: 08/23/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
High Efficiency Molten-Bed Oxy-Coal Combustion with Low Flue Gas Recirculation CX(s) Applied: B3.6 Date: 08/23/2012 Location(s): Utah Offices(s): National Energy Technology Laboratory
Dismantle and Remove Area Radiation Monitors (General) CX(s) Applied: B3.1 Date: 08/23/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Pull/Install New Fiber Optic Cables From 241-2H to 241-62F (General) CX(s) Applied: B1.7 Date: 08/23/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Work Performed in the Glass Apparatus Lab CX(s) Applied: B3.6 Date: 08/23/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
State Energy Program - Tennessee CX(s) Applied: A9, A11 Date: 08/23/2012 Location(s): Tennessee Offices(s): Golden Field Office
Replace Three Wood Poles-In-Kind at Bryan Mound West Gate CX(s) Applied: B1.3 Date: 08/23/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Virginia-County-Albemarle CX(s) Applied: A1, A9, A11, B2.5, B5.1 Date: 08/23/2012 Location(s): Virginia Offices(s): Energy Efficiency and Renewable Energy