Building 29-31 Internal Electrical Upgrades CX(s) Applied: B2.1, B2.5, B4.6 Date: 08/20/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Innovative Manufacturing Process for Improving the Erosion/Corrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing Methods – Electric Power Research Institute CX(s) Applied: B3.6 Date: 08/20/2012 Location(s): ...
Study of Intermetallic Nanostructures for Light-water Reactor Materials – Regents of the University of California CX(s) Applied: B3.6 Date: 08/20/2012 Location(s): California Offices(s): Nuclear Energy
Wave Energy Technology- New Zealand Multi-Mode Wave Energy Converter Advancement Project CX(s) Applied: A9, B3.6 Date: 08/20/2012 Location(s): Oregon Offices(s): Golden Field Office
Town of Franklin Weatherization Retrofits CX(s) Applied: B5.1 Date: 08/20/2012 Location(s): Vermont Offices(s): Golden Field Office
Development of Integrated Die Casting Process For Large Thin-Wall Magnesium Applications CX(s) Applied: A9, B3.6 Date: 08/20/2012 Location(s): Michigan, Michigan, Ohio, Michigan Offices(s): Golden Field Office
Gas Technology Institute- Commercial Prototype Adsorbed Natural Gas System for Light Duty Vehicles CX(s) Applied: B3.6 Date: 08/20/2012 Location(s): Illinois, Illinois Offices(s): Advanced Research Projects Agency-Energy
Gas Technology Institute- Nano-Valved Adsorbents for CH4 Storage CX(s) Applied: B3.6 Date: 08/20/2012 Location(s): Illinois, Kentucky, South Carolina Offices(s): Advanced Research Projects Agency-Energy
Pecan Street Smart Grid Extension Service - Phase I CX(s) Applied: A9, A11, B5.1 Date: 08/17/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Plug-in Hybrid Electric Medium Duty Commercial Fleet Demonstration and Evaluation CX(s) Applied: B5.1 Date: 08/17/2012 Location(s): North Carolina Offices(s): National Energy Technology Laboratory